Full Paper View Go Back

Fuzzy Mathematical Model For Optimizing Success Criteria Of Projects: A Project Management Application

Mohammad Sammany1 , Ahmad Steef2 , Nedaa Agami3 , T. Medhat4

Section:Research Paper, Product Type: Journal-Paper
Vol.8 , Issue.5 , pp.77-83, Oct-2020


Online published on Oct 31, 2020


Copyright © Mohammad Sammany, Ahmad Steef, Nedaa Agami, T. Medhat . This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
 

View this paper at   Google Scholar | DPI Digital Library


XML View     PDF Download

How to Cite this Paper

  • IEEE Citation
  • MLA Citation
  • APA Citation
  • BibTex Citation
  • RIS Citation

IEEE Style Citation: Mohammad Sammany, Ahmad Steef, Nedaa Agami, T. Medhat, “Fuzzy Mathematical Model For Optimizing Success Criteria Of Projects: A Project Management Application,” International Journal of Scientific Research in Computer Science and Engineering, Vol.8, Issue.5, pp.77-83, 2020.

MLA Style Citation: Mohammad Sammany, Ahmad Steef, Nedaa Agami, T. Medhat "Fuzzy Mathematical Model For Optimizing Success Criteria Of Projects: A Project Management Application." International Journal of Scientific Research in Computer Science and Engineering 8.5 (2020): 77-83.

APA Style Citation: Mohammad Sammany, Ahmad Steef, Nedaa Agami, T. Medhat, (2020). Fuzzy Mathematical Model For Optimizing Success Criteria Of Projects: A Project Management Application. International Journal of Scientific Research in Computer Science and Engineering, 8(5), 77-83.

BibTex Style Citation:
@article{Sammany_2020,
author = {Mohammad Sammany, Ahmad Steef, Nedaa Agami, T. Medhat},
title = {Fuzzy Mathematical Model For Optimizing Success Criteria Of Projects: A Project Management Application},
journal = {International Journal of Scientific Research in Computer Science and Engineering},
issue_date = {10 2020},
volume = {8},
Issue = {5},
month = {10},
year = {2020},
issn = {2347-2693},
pages = {77-83},
url = {https://www.isroset.org/journal/IJSRCSE/full_paper_view.php?paper_id=2107},
publisher = {IJCSE, Indore, INDIA},
}

RIS Style Citation:
TY - JOUR
UR - https://www.isroset.org/journal/IJSRCSE/full_paper_view.php?paper_id=2107
TI - Fuzzy Mathematical Model For Optimizing Success Criteria Of Projects: A Project Management Application
T2 - International Journal of Scientific Research in Computer Science and Engineering
AU - Mohammad Sammany, Ahmad Steef, Nedaa Agami, T. Medhat
PY - 2020
DA - 2020/10/31
PB - IJCSE, Indore, INDIA
SP - 77-83
IS - 5
VL - 8
SN - 2347-2693
ER -

404 Views    512 Downloads    66 Downloads
  
  

Abstract :
It is well known over the recent years that measuring the success of projects under the umbrella of project management is inextricably linked with the associated cost, time, and quality. Most of the previous researches in the field assigned a separate mathematical model for each criterion, then numerical methods or search techniques were applied to obtain the optimal trade-off between the three criteria. However in this paper, the problem was addressed by linear multi-objective optimization using only one fuzzy mathematical model. The three criteria were merged in a single non-linear membership function to find the optimal trade-off. Finally, the proposed model is tested and validated using numerical examples.

Key-Words / Index Term :
Project Management; Criteria Optimization; Fuzzy Mathematical Model

References :
[1] Babu, A.J.G and Suresh. N., project management with time, cost, and quality–European J. Operations Research,-1996,320-327.
[2] Do Ba KHang, Yin Mon Myint, "Time cost and Quality trade-off in project management: case study", International Journal of Project Management, vol,17,No,1999,pp,249-256.
[3] Hamdy A. Taha.,2007-Operations Research: An introduction., University of Arkansas, Fayetteville,813.
[4] Kaheled El-Rayes, Amr Kandil, Time-cost-quality trade-off analysis for highway construction, Journal of Construction. Engineering Management, 2005 477-485.
[5] Shrivastava. R, Singh.S and G. C. Dubey, India: Multi Objective Optimization of Time Cost Quality Quantity Using Multi Colony Ant Algorithm, Int. J. Contemp. Math. Sciences, Vol. 7, 2012, no. 16, 773 – 784.
[6] A. Afshar, A. Kaveh and O.R. Shoghli, Multi Objective Optimization of Time Cost Quality Quantity Using Multi Colony Ant Algorithm, Iran, Asian, journal of civil engineering vol. 8, no. 2 (2007)-113-124.
[7] Kagade., K.L. and Bajaj., V.H,fuzzy method for solving multi-objective assignment problem with interval cost, journal of statistics and Mathematics,vol.1,issue1,2010,pp:1-9.
[8] P.K.De and DhartiYadav, An algorithm to solve multi –Objective assignment problem using interactive fuzzy Goal programming approach, Int.J. Contemp. Math. Sciences, vol.6,2011, no.34,1651-1662.
[9] P.Biswas And S. Pramanik, Multi-Objective Assignment problem with Fuzzy Costs for the Case of Military Affairs, International Journal of Computer Applications, vol 30-No,10,September 2011.
[10] BodkheS.G.,BajajV.H,Fuzzy Programming technique to solve bi-objective transportation problem, international journal of machine-intelligence, vol 2,issue 1,2010,pp:46-52.
[11] N. Ganapathy Ramasam, I. Mohamed Shaik Hameed, P. Ajai and Priya Sera Varkey,-November 2016, A Correlated Study between Time and Cost in Accordance with Fuzzy Logic, Indian Journal of Science and Technology, Vol 9(44), DOI: 10.17485/ijst/2016/v9i44/98800
[12] S. M. Mirmohseni, S. H. Nasseri, and A. Zabihi., 2017- An Interactive Possibilistic Programming for Fuzzy Multi Objective Solid Transportatio Problem, Applied Mathematical Sciences, Vol. 11, 2017, no. 45, 2209 – 2217
[13] Ehsan Ehsani, Nima Kazemi, Ezutah Udoncy Olugu, Eric H. Grosse, Kurt Schwindl., 2016- Applying fuzzy multi-objective linear programming to a project management decision with non-linear fuzzy membership functions, Neural Computing and Applications. . 10.1007/s00521-015-2160-0.
[14] J.Singh, fuzzy logics and fuzzy sets theory based multi-objective-Decision Making, Modeling Tool generalized for planning for Sustainable Water Supply, Institute of Town Planners, India Journal, 3,July-September 2011,73-80.
[15] kagadeK.L .and BajajV. H, Fuzzy approach with linear and some non-Linear membership functions for solving multi-objective assignment problems, advances in computational research, vol1,issue,2,2009 pp:14-17.
[16] P.K.De,A General Approach for Solving assignment problems Involving with Fuzzy Costcoefficients,vol,6,No,3:March 2012.
[17] S.Behera and J. Nayak, Solution of multi-objective Mathematical programming problems in fuzzy approach, vol 3 No,12 December 2011.
[18] Control: Managing Engineering, Construction and Manufacturing Projects to PMI, APM and BSI Standards,. Elsevier Science & Technology Books,431.
[19] Frederick S., Mark S., 2011- PERT/CPM Models for Project Management. In: Introduction to Management Science, Universityof Washington, PP:1-22.

Authorization Required

 

You do not have rights to view the full text article.
Please contact administration for subscription to Journal or individual article.
Mail us at  support@isroset.org or view contact page for more details.

Go to Navigation