Full Paper View Go Back
Mansur Nuhu Alhassan1 , Zakariya Abubakar2 , Saadatu Abubakar3
Section:Research Paper, Product Type: Journal-Paper
Vol.11 ,
Issue.3 , pp.17-21, Sep-2024
Online published on Sep 30, 2024
Copyright © Mansur Nuhu Alhassan, Zakariya Abubakar, Saadatu Abubakar . This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
View this paper at Google Scholar | DPI Digital Library
How to Cite this Paper
- IEEE Citation
- MLA Citation
- APA Citation
- BibTex Citation
- RIS Citation
IEEE Style Citation: Mansur Nuhu Alhassan, Zakariya Abubakar, Saadatu Abubakar, “Efficient Project Management Schedule for MSc Studies in Northwestern Nigerian Universities Employing CPM and PERT Techniques,” World Academics Journal of Engineering Sciences, Vol.11, Issue.3, pp.17-21, 2024.
MLA Style Citation: Mansur Nuhu Alhassan, Zakariya Abubakar, Saadatu Abubakar "Efficient Project Management Schedule for MSc Studies in Northwestern Nigerian Universities Employing CPM and PERT Techniques." World Academics Journal of Engineering Sciences 11.3 (2024): 17-21.
APA Style Citation: Mansur Nuhu Alhassan, Zakariya Abubakar, Saadatu Abubakar, (2024). Efficient Project Management Schedule for MSc Studies in Northwestern Nigerian Universities Employing CPM and PERT Techniques. World Academics Journal of Engineering Sciences, 11(3), 17-21.
BibTex Style Citation:
@article{Alhassan_2024,
author = {Mansur Nuhu Alhassan, Zakariya Abubakar, Saadatu Abubakar},
title = {Efficient Project Management Schedule for MSc Studies in Northwestern Nigerian Universities Employing CPM and PERT Techniques},
journal = {World Academics Journal of Engineering Sciences},
issue_date = {9 2024},
volume = {11},
Issue = {3},
month = {9},
year = {2024},
issn = {2347-2693},
pages = {17-21},
url = {https://www.isroset.org/journal/WAJES/full_paper_view.php?paper_id=3636},
publisher = {IJCSE, Indore, INDIA},
}
RIS Style Citation:
TY - JOUR
UR - https://www.isroset.org/journal/WAJES/full_paper_view.php?paper_id=3636
TI - Efficient Project Management Schedule for MSc Studies in Northwestern Nigerian Universities Employing CPM and PERT Techniques
T2 - World Academics Journal of Engineering Sciences
AU - Mansur Nuhu Alhassan, Zakariya Abubakar, Saadatu Abubakar
PY - 2024
DA - 2024/09/30
PB - IJCSE, Indore, INDIA
SP - 17-21
IS - 3
VL - 11
SN - 2347-2693
ER -
Abstract :
Effective project execution relies heavily on sound planning and scheduling methods. Unfortunately, planning and scheduling often pose challenges due to their complexity and time consuming nature. This research focuses on identifying the critical activities involved in MSc studies and developing an optimal project management schedule for MSc students in chosen universities in Northern Nigeria, utilizing CPM and PERT methodologies. Data was collected through a survey questionnaire distributed to final year Masters Students and MSc holders in the selected universities, employing a convenience sampling approach. Critical activities identified include; Review of Literature, Writing of Proposal, Proposal Defence, Generation of the Results, and Presentation of the Results, Thesis Writing, Submission of Thesis, Internal Defence, Final Correction, Final Submission and Graduation. The study determined an optimal Master’s program duration of 35 months, with a high probability (0.99) of completing the program within this timeframe.
Key-Words / Index Term :
Project Management, Probabilistic computations, Network analysis, Optimal Schedule, Critical Path
References :
[1] J. J. Smallwood, “The Practice of Construction Management”, Acta Structilia, vol. 13, no. 2, pp. 62-89, 2006.
[2] D. W. Johnson, et al, “Effects of Cooperative, Competitive and Individualistic Goal Structures on Achievement: Ameta-Analysis,” American Psychological Association, vol. 75, 1981.
[3] F. Correia, A. Antonio, “An overview of Critical Chain applied to Project Management,” Recent Advances in Manufacturing Engineering, vol. 21 no. 3, pp. 541-576, 2011.
[4] R. Arun, “Project Management, Simply Learn Solutions,” Project Management Institute, Inc. 2020.
[5] E. Lau, et al, “Operating Principles, Analysis Method and Performance Evaluation,” Operations Research Methods, vol 23, no. 9, pp. 56-73, 2003.
[6] K. D. Kelsey, H. Lin, “Building a Networked Environment in Wikis: The Evolving Phases of Collaborative Learning in a Wiki book Project,” Journal of Educational Computing Research, vol. 40, no. 2, pp. 145-169, 2009.
[7] K. Greenwood, “Project management and planning,” Project Management, Planning and Control, vol. 72, no. 80, 2009.
[8] K. B. Luidjei, “Estimation of Activity Times. A Qualitative Case Study on Agile Practices and Project Success in Agile Software,” Journal of Modern Project Management, vol. 5, pp. 62-73, 2011.
[9] F. Habibi, et al, “Using Fuzzy Logic to Improve project efficiency,” Global journal of pure and applied sciences, vol. 8, no. 3, pp. 347-355, 2018.
[10] E. N. Chrzanowski, D. Johnston, “Application of Linear Scheduling and Engineering,” Journal of Construction Engineering, vol. 112 , no. 4, pp. 476-491, 1986.
[11] M. B. Larry, H. C. Richard, “Global Aspects of Classical Integrable Systems,” 2nd Edition. Birkha ?user Verlag, Switzerland. ISBN 978-3- 0348-0917-7.
[12] L. Ming, S. AbouRizk, “Closure to Simplified CPM/PERT Simulation Model,” Journal of Construction Engineering and Management, vol. 127, pp. 215-235, 2001.
[13] R. Francois, S. Honjo, R. Krishfield, S. Manganini, “Factors Controlling the Flux of Organic Carbon to the Bathypelagic Zone of the Ocean,” Global Biogeochemical Cycles, vol. 16 no. 4, pp. 10876, 2002.
[14] P. Singh, F. Nestmann, S. Caglar, J. T. Kshirsagar, “Hydraulic Performance Optimization in Pumps as Turbines,” Section 8, Pump Users International Forum 2005, Karlsruhe, VDMA, Germany, 2005.
[15] M. Lu, H. Lam, “Critical Path Scheduling under Resource Calendar Constraints”. Journal of Construction Engineering and Management,” vol. 134 no. 1, 2008.
[16] E. D. Hancher, “Construction Planning and Scheduling,” Chapter Two, CRC Press LLC, 2003.
[17] D. Sarkar, R. Babu, “Applications of Critical Chain Project,” International Advanced Research Journal in Science, Engineering and Technology, vol. 3 no. 7, pp. 5, 2012.
[18] H. R. Z. Dolabi, A. Afshar, R. Abbasnia, “Scheduling Method for Project Deadline Constraint Satisfaction,” Automation in Construction, vol. 48, pp. 107-118, 2014.
[19] V. Bhosale, S. S. Shastri, M. A. Khandare, “A Review of Genetic Algorithm used for Optimizing Scheduling of Constraint Construction Projects”. 2017.
[20] S. Zareei, “Project Scheduling for Constructing Biogas Plant Using Critical Path Method,” Renewable and Sustainable Energy Reviews, vol. 81, pp. 756-759, 2018.
[21] P. H. Lusha, “Effective Project Management, a Qualitative Case Study on Time Management and Effective Resource Utilization,” 2003.
You do not have rights to view the full text article.
Please contact administration for subscription to Journal or individual article.
Mail us at support@isroset.org or view contact page for more details.