References
[1] Babu, A.J.G and Suresh. N., project management with time, cost, and quality–European J. Operations Research,-1996,320-327.
[2] Do Ba KHang, Yin Mon Myint, "Time cost and Quality trade-off in project management: case study", International Journal of Project Management, vol,17,No,1999,pp,249-256.
[3] Hamdy A. Taha.,2007-Operations Research: An introduction., University of Arkansas, Fayetteville,813.
[4] Kaheled El-Rayes, Amr Kandil, Time-cost-quality trade-off analysis for highway construction, Journal of Construction. Engineering Management, 2005 477-485.
[5] Shrivastava. R, Singh.S and G. C. Dubey, India: Multi Objective Optimization of Time Cost Quality Quantity Using Multi Colony Ant Algorithm, Int. J. Contemp. Math. Sciences, Vol. 7, 2012, no. 16, 773 – 784.
[6] A. Afshar, A. Kaveh and O.R. Shoghli, Multi Objective Optimization of Time Cost Quality Quantity Using Multi Colony Ant Algorithm, Iran, Asian, journal of civil engineering vol. 8, no. 2 (2007)-113-124.
[7] Kagade., K.L. and Bajaj., V.H,fuzzy method for solving multi-objective assignment problem with interval cost, journal of statistics and Mathematics,vol.1,issue1,2010,pp:1-9.
[8] P.K.De and DhartiYadav, An algorithm to solve multi –Objective assignment problem using interactive fuzzy Goal programming approach, Int.J. Contemp. Math. Sciences, vol.6,2011, no.34,1651-1662.
[9] P.Biswas And S. Pramanik, Multi-Objective Assignment problem with Fuzzy Costs for the Case of Military Affairs, International Journal of Computer Applications, vol 30-No,10,September 2011.
[10] BodkheS.G.,BajajV.H,Fuzzy Programming technique to solve bi-objective transportation problem, international journal of machine-intelligence, vol 2,issue 1,2010,pp:46-52.
[11] N. Ganapathy Ramasam, I. Mohamed Shaik Hameed, P. Ajai and Priya Sera Varkey,-November 2016, A Correlated Study between Time and Cost in Accordance with Fuzzy Logic, Indian Journal of Science and Technology, Vol 9(44), DOI: 10.17485/ijst/2016/v9i44/98800
[12] S. M. Mirmohseni, S. H. Nasseri, and A. Zabihi., 2017- An Interactive Possibilistic Programming for Fuzzy Multi Objective Solid Transportatio Problem, Applied Mathematical Sciences, Vol. 11, 2017, no. 45, 2209 – 2217
[13] Ehsan Ehsani, Nima Kazemi, Ezutah Udoncy Olugu, Eric H. Grosse, Kurt Schwindl., 2016- Applying fuzzy multi-objective linear programming to a project management decision with non-linear fuzzy membership functions, Neural Computing and Applications. . 10.1007/s00521-015-2160-0.
[14] J.Singh, fuzzy logics and fuzzy sets theory based multi-objective-Decision Making, Modeling Tool generalized for planning for Sustainable Water Supply, Institute of Town Planners, India Journal, 3,July-September 2011,73-80.
[15] kagadeK.L .and BajajV. H, Fuzzy approach with linear and some non-Linear membership functions for solving multi-objective assignment problems, advances in computational research, vol1,issue,2,2009 pp:14-17.
[16] P.K.De,A General Approach for Solving assignment problems Involving with Fuzzy Costcoefficients,vol,6,No,3:March 2012.
[17] S.Behera and J. Nayak, Solution of multi-objective Mathematical programming problems in fuzzy approach, vol 3 No,12 December 2011.
[18] Control: Managing Engineering, Construction and Manufacturing Projects to PMI, APM and BSI Standards,. Elsevier Science & Technology Books,431.
[19] Frederick S., Mark S., 2011- PERT/CPM Models for Project Management. In: Introduction to Management Science, Universityof Washington, PP:1-22.